The back of LUT #3, showing pipe details, and the cable trays (rising up through the decks)
|
 Closeup of cable trays
|
 Long shot of back of LUT
|
 View of Sway Damper Arm installation on LUT #2
|

Rare color photo of arm
 Arm 4's Hinge to LUT
|
 Arm 5 shown connected to S-2 Stage (at right, in VAB)
|
 Umbilical end of Arm 5
|
 Arm's 3 and 4 where they enter the VAB structure
|